Ningbo Rail Transportation Line 1 Phase 2

Ningbo Rail Transportation Line 1 Phase 2

· Features
The metros supplied for Ningbo Line 1 Phase 2 are B type metro formed by 6 cars (4M2T).The metro adopts al-welded drum shape aluminum alloy carbody. The maximum operation speed is 80km/h and the design speed can achieve 90km/h. Current collection mode uses DC1500V overhead catenary; the traction system is made in China and the whole train adopts modular design.

· Technical Data

Current collection mode: DC 1500V overhead catenary
Train configuration: +TC-MP-M=M-MP-TC+
Width: 2800mm
Length: 118788mm
Floor height: 1100mm
Wheelbase: 2300mm
Axle load: 14t
Passenger capacity: 2062 people

Related posts

Popular products

Product categories