Vehicles for Guangzhou Metro Line 3
· Features
CRRC ZELC and SIEMENS cooperated and got the order which need provide 120 metros for Guangzhou rail transportation line 3 (3 cars for each train, 40 trains in total ) in 2003. Guangzhou rail transportation line 3 is 36.33km. It has 18 stations in total.
· Technical Data
| Current collection mode: | DC 1500V overhead catenary |
|---|---|
| Train configuration: | -A+B+A- |
| Width: | 2800mm |
| Length: | 59940mm |
| Floor height: | 1130mm |
| Wheelbase: | 2300mm |
| Axle load: | 14t |
| Passenger capacity: | 941 people |